Industrial gamma units
Decommissioning of industrial gamma units
Full cycle: documentation, source unloading, dismantling and equipment removal.
JSC Kvant performs the full cycle of decommissioning industrial gamma units, including source unloading and equipment dismantling.
Work stages
- Preparation of design documentation — decommissioning plan and process charts.
- Source unloading — cask delivery, safe transfer of the radioactive source, removal to a specialized facility.
- Equipment dismantling — mechanical disassembly, cutting and packaging, removal for disposal.
What happens to the source next
- Transfer for long-term storage to a specialized organization
- Return to the manufacturer for reprocessing
- Reclassification as radioactive waste
Licences
Decommissioning of radiation sources is carried out under Rostechnadzor licence UO-(US)-04-206-2899. Unloading of units and reclassification of sources as radioactive waste is covered by licence UO-03-206-3552.