Decommissioning of industrial gamma units

Industrial gamma units

Decommissioning of industrial gamma units

Full cycle: documentation, source unloading, dismantling and equipment removal.

JSC Kvant performs the full cycle of decommissioning industrial gamma units, including source unloading and equipment dismantling.

Work stages

  • Preparation of design documentation — decommissioning plan and process charts.
  • Source unloading — cask delivery, safe transfer of the radioactive source, removal to a specialized facility.
  • Equipment dismantling — mechanical disassembly, cutting and packaging, removal for disposal.

What happens to the source next

  • Transfer for long-term storage to a specialized organization
  • Return to the manufacturer for reprocessing
  • Reclassification as radioactive waste

Licences

Decommissioning of radiation sources is carried out under Rostechnadzor licence UO-(US)-04-206-2899. Unloading of units and reclassification of sources as radioactive waste is covered by licence UO-03-206-3552.

Let's discuss your task

Describe the site and the work required — a specialist will clarify the details and prepare a proposal.

+7 (343) 227-60-06